Difference between revisions of "Documentation/How Tos/Calc: WORKDAY function"
From Apache OpenOffice Wiki
< Documentation | How Tos
(Initial content) |
m |
||
Line 3: | Line 3: | ||
== WORKDAY == | == WORKDAY == | ||
Returns a date a given number of workdays away. | Returns a date a given number of workdays away. | ||
+ | |||
+ | This function is only available if the '''Analysis AddIn''' is installed. | ||
=== Syntax: === | === Syntax: === |
Revision as of 14:37, 15 January 2008
WORKDAY
Returns a date a given number of workdays away.
This function is only available if the Analysis AddIn is installed.
Syntax:
WORKDAY(startdate; days; hols_range)
- returns the date that is days workdays after the given date startdate.
- days is a number (which may be negative to find a date before startdate).
- Saturday and Sunday are assumed to be non-working days. hols_range (optional) is a range containing dates of other non-working days.
Example:
WORKDAY("2008/09/05"; 1)
- returns the date-time serial number for Monday 8Sep08. 5Sep08 is a Friday.
WORKDAY("2008/09/05"; 1; D1:D2)
- where D1 contains 8Sep08 and D2 contains 25Dec08, returns the date-time serial number for 9Sep08. The 8Sep08 is specified as a holiday.