User:Foral/QA

From Apache OpenOffice Wiki
< User:Foral
Revision as of 19:49, 2 May 2009 by Foral (Talk | contribs)

Jump to: navigation, search

For Native Lang Project

What should we do?

General

RC Version(Release Test)

Aim of Release testing.

First Step

VCLTestTool Release Test

Release tests are those which must run . These tests should finish without any failure

Second Step

Automation test with VCL Test Tool

Manual test with TestCaseManagement

l10n Test with TCM

aim of l10n test.

Manual Test

Automation Test and Check

Automation Test

Bata Version

An early view of the next major release of OOo. A beta has all the features of the new release, but may still contain significant bugs

Dev Build(Alpha Version)

General

The second step ("Manual testing") is meant for participants with more skills. You are able to do manual testing on your own. You can execute and write Test-Case-Specifications (TCS) and submit issues found when dealing with Test-Case-Specifications. The page contains all information needed to contribute to the second participation step.

Feature Freeze Testing

Development

Translation

Automating_Translation_QA

Develop

Link

Personal tools