Difference between revisions of "Renaissance:Prototyping"

From Apache OpenOffice Wiki
Jump to: navigation, search
Line 16: Line 16:
 
** Prototypes have been checked in to version control system
 
** Prototypes have been checked in to version control system
 
** Prototypes have been joined
 
** Prototypes have been joined
** Scrollbar shows button, snapping to sections and highlighting choice (Bernd)
+
** Scrollbar shows button, snapping to sections and highlighting current choice (Bernd)
 
** Document canvas shows color gradient (Andre)
 
** Document canvas shows color gradient (Andre)
** Document/slide contain objects with limited functionality (Andre)
+
** Document/slide contains objects with limited functionality (Andre)
 +
** Control window to set window sizes (Andre)
 
** ToDo:
 
** ToDo:
 
*** Prepare a tabbed prototype (Andre)
 
*** Prepare a tabbed prototype (Andre)
*** Optimize scrolling (Bernd)
+
*** Optimize scrolling of toolbar (Bernd)
 
*** Provide toolbar content as bitmaps (Frank)
 
*** Provide toolbar content as bitmaps (Frank)
  
 
* '''Tues., 16 June: Daily status meeting'''
 
* '''Tues., 16 June: Daily status meeting'''
** Two Java separated based prototypes of a prototype
+
** Two separated Java based prototypes of a prototype presented
 
** ToDo:
 
** ToDo:
 
*** Add a control window so set prototype and window sizes
 
*** Add a control window so set prototype and window sizes
*** Join prototypes and extend sliding
+
*** Join prototypes and extend sliding & document/canvas
  
 
* '''Mo., 15 June: Kick-off meeting with prototyping team'''
 
* '''Mo., 15 June: Kick-off meeting with prototyping team'''
Line 35: Line 36:
 
** Starting with sliding prototype
 
** Starting with sliding prototype
 
** ToDo:
 
** ToDo:
 +
*** Set up prototyping framework (Andre/Bernd)
 
*** Slider implementation (Bernd)
 
*** Slider implementation (Bernd)
*** Document canvas, slide pane and statusbar with zoom (Andre)
+
*** Document canvas, slide pane and statusbar with zoom slider (Andre)
  
 
* '''Fr., 12 June: Kick-Off meeting with team & sponsors'''
 
* '''Fr., 12 June: Kick-Off meeting with team & sponsors'''

Revision as of 10:54, 17 June 2009

ux-ooo-logo-rgb-129-61.png

ux.openoffice.org

Quick Navigation

Team

Prototyping

The prototyping phase has been started on Friday, 12 June 2009. This phase is limited to six weeks and ends on July 24. Prototypes will be made public when ready.

Goal

Building a flexible framework for prototyping to test promising UI designs with real users.

Team

Progress

  • Wed., 17 June: Daily status meeting
    • Prototypes have been checked in to version control system
    • Prototypes have been joined
    • Scrollbar shows button, snapping to sections and highlighting current choice (Bernd)
    • Document canvas shows color gradient (Andre)
    • Document/slide contains objects with limited functionality (Andre)
    • Control window to set window sizes (Andre)
    • ToDo:
      • Prepare a tabbed prototype (Andre)
      • Optimize scrolling of toolbar (Bernd)
      • Provide toolbar content as bitmaps (Frank)
  • Tues., 16 June: Daily status meeting
    • Two separated Java based prototypes of a prototype presented
    • ToDo:
      • Add a control window so set prototype and window sizes
      • Join prototypes and extend sliding & document/canvas
  • Mo., 15 June: Kick-off meeting with prototyping team
    • Using Java for prototyping
    • Create a modular prototype to be able to make different versions of a UI concept
    • Starting with sliding prototype
    • ToDo:
      • Set up prototyping framework (Andre/Bernd)
      • Slider implementation (Bernd)
      • Document canvas, slide pane and statusbar with zoom slider (Andre)
  • Fr., 12 June: Kick-Off meeting with team & sponsors
Personal tools