Difference between revisions of "Renaissance:Prototyping"
From Apache OpenOffice Wiki
Line 14: | Line 14: | ||
== Prototypes == | == Prototypes == | ||
The latest prototype can be started [http://tools.services.openoffice.org/impressprototype/impressprototype.jnlp here] (Java 6 required) | The latest prototype can be started [http://tools.services.openoffice.org/impressprototype/impressprototype.jnlp here] (Java 6 required) | ||
+ | [[Image:Prototype.jpg]] | ||
== Progress / Mini-Minutes == | == Progress / Mini-Minutes == |
Revision as of 11:03, 20 July 2009
|
---|
Quick Navigation
Team |
Contents
Prototyping
The prototyping phase has been started on Friday, 12 June 2009. This phase is limited to six weeks and ends on July 24. Prototypes will be made public when ready.
Goal
Building a flexible framework for prototyping to test promising UI designs with real users.
Team
- Andreas Bartel (andba) - User Experience Tech Lead for Project Renaissance
- Andre Fischer (Andre Fischer) - Developer
- Bernd Eilers (bei) - Developer
- Frank Loehmann (fl) - OpenOffice.org User Experience Project Lead
Prototypes
The latest prototype can be started here (Java 6 required) File:Prototype.jpg
Progress / Mini-Minutes
- Mon., 20 July: Daily status meeting
- Presentation/Discussion of latest prototype v0.10 (All)
- ToDo:
- Work on toolbar content (Andre)
- Toolbar content definition (Frank)
- Slide Preview: Scrolling by mouse wheel must not change selection (Andre)
- Zoom with Ctrl+Scrolling mouse wheel is too slow (Andre)
- Adjust statusbar spacing (Bernd)
- Change master mode behavior. Show master of current slide only (Andre)
- Add layouts to presentation (Andre)
- Fri., 17 July: Daily status meeting
- Presentation/Discussion of latest prototype v0.9 (All)
- ToDo:
- Work on toolbar content (Andre)
- Toolbar content definition (Andreas)
- Add new 'Variante 3' to FixedLabel Toolbar prototype showing the labels on top (i.e. if minimized toolbar, or if no menu is present)
- Start presentation by a button instead of a separate viewing mode (Bernd) (done)
- Thu., 16 July: Daily status meeting
- Presentation/Discussion of latest prototype v0.9 (All)
- ToDo:
- Add Master View (Andre) (done)
- Add different slide layouts (Andre) (done)
- Overwork fixed buttons area (Bernd) (done)
- Remove View category (done)
- Work on toolbar content (Andre)
- Toolbar content definition (Andreas)
- Overwork 3D view (enlarge slide, animation) (Bernd) (done)
- Wed., 15 July: Daily status meeting
- Presentation/Discussion of latest prototype v0.9 (All)
- ToDo:
- Add Master View (Andreas)
- Work on toolbar content (Andre)
- Toolbar content definition (Andreas)
- Tue., 14 July: Daily status meeting
- Presentation/Discussion of latest prototype v0.9 (All)
- ToDo:
- Work on toolbar content (Andre)
- Prepare for focus group on Wednesday (Andreas, Frank) (Done)
- Toolbar content definition (Andreas)
- Fix scrolling toolbar prototype (Variant 3) hang up. (Done)
- Mon., 13 July: Daily status meeting
- Presentation/Discussion of latest prototype (All)
- ToDo:
- Prepare for focus group on Wednesday
- Remove Master and Outline View from status bar (done)
- Improve text-shapes (done)
- Toolbar content definition (Andreas)
Tasks to support
- Must have
- insert slide (done)
- delete slide (done)
- duplicate slide (done)
- change slide layout
- change slide design
- input text (done)
- navigate through slides (done)
- Nice to have
- insert image (done)
- insert shape (done)
- insert table
- insert text field (done)
- If possible
- modify image
- modify shape (done)
- modify table