For Pentium/Opteron machines, we used VMware Player which is freely available.  http://www.vmware.com/products/player/ In this document, we intensively used VMware Player. Pros and Cons are following:
+
For Pentium 4/Athlon/Opteron machines, we used VMware Player which is freely available.  http://www.vmware.com/products/player/ In this document, we intensively used VMware Player. Pros and Cons are following:
 
   
 
   
 
Pros:
 
Pros:

Revision as of 02:13, 12 January 2007


Introduction

The development cycle of OpenOffice.org(OOo), the release engineering team, and other volunteers provide release candidates. For example OOo 2.1, 2.1RC1 and RC2... To mark as `released', release candidate packages must be QA'ed. How candidates are QA'ed are up-to the responsibilities of QA lead of each native language project or porting team. A possible release test can be done by using VCL testtool, and it is widely accepted.

Using VMware Player

For Pentium 4/Athlon/Opteron machines, we used VMware Player which is freely available. http://www.vmware.com/products/player/ In this document, we intensively used VMware Player. Pros and Cons are following:

Pros:

  • Fast!
  • We can isolate environments so that do not change settings for QA test.
  • We can perform clean tests. Some other installed software affect your tests.
  • Usually we can perform two tests at the same time, because VCL test doesn't consume much CPU resources.

Cons:

How long does one release test take?

  • Release sanity test usually takes about 15 hours regardless of the platform, e.g., CPU etc.
  • Full test (usuanlly not recommended) takes 3 days.