Difference between revisions of "QUASTe - First steps"

From Apache OpenOffice Wiki
Jump to: navigation, search
m (Added reference to the Slovenian translation of this page)
(Spanish locale)
 
Line 1: Line 1:
[[sl:SL/QUASTe_-_First_steps]]
+
[[sl:SL/QUASTe_-_First_steps]]  
 +
[[es:ES/QUASTe_PrimerosPasos]]
 +
 
 
<b>- Page under construction - </b><br>
 
<b>- Page under construction - </b><br>
  

Latest revision as of 20:00, 24 April 2011


- Page under construction -


How to use QUASTe?


First steps to use QUASTe.


What is "QUASTe" ?

See QUASTe-FAQ for details on this.

Testresults grouped by platform

QUASTe-mws-overview.jpg

The Main result page shows a complete overview of all testresults grouped by platform.

Detailed description for each area:

1. This is the header of the page and shows information on which Masterworkspace (SRC), Milestone (m248) and BuildId the testresults are based.

2. This is the list where one is able to select the milestone based on current Masterworkspace. If a milestone is not found in list there are no testresults generated.

3. This area shows the category the milestone is. This information is based on the category model in automated testing which is described here

4. This is the language of the tested milestone where the testresults are based on. The result-tables of different languages will be shown one below the other. If a language is not listed it holds no testresults.

5. This cell shows the platform the testresults are based on

6. This cell shows the detailed information of how many tests are passed based on their category described in the category model - release tests are those tests that must run on each milestone. - required tests are those tests depending on the category described in area 3. If current milestone is a release or cws this tests become optional tests otherwise these tests must pass on current milestone - optional tests must not run on the current milestone and are not in category 0 (release tests) or in current category as shown area 3. These tests are not required to be passed successfully on current milestone.

7. Here the summarized failures of release and required only are shown. Failures occured in optional tests are not included here as they are not relevant for estimating the quality status of a specific milestone.

8. This is a graphical cell that shows the VTTDI-Index. Detailed description on how to calculate the VTTDI-Index and its colors is described here


Testresults grouped by application

QUASTe-mws-detail-1.jpg


to be continued

Testresults grouped by test

to be done


See also:

Helpful links

- the homepage of the QA project on OOo : http://qa.openoffice.org
- the mailing list of the QA project : http://qa.openoffice.org/servlets/SummarizeList?listName=dev
- query for existing bugs in IssueTracker : http://qa.openoffice.org/issues/query.cgi
- writing a new issue in IssueTracker : http://qa.openoffice.org/issue_handling/pre_submission.html
- the QA category on OOo wiki : Quality Assurance

Personal tools
In other languages