The OOSE defined APM project management methodology defines the scheduling of each iteration *TIME BOXING*. This basically means that each iteration is fixed in both its begin and end datetime, and may not be prolonged once scheduled.
 
The OOSE defined APM project management methodology defines the scheduling of each iteration *TIME BOXING*. This basically means that each iteration is fixed in both its begin and end datetime, and may not be prolonged once scheduled.
 +
 +
{{Template:OOPM:Templates:Documentation:Shared:TBD|In comes our agile movement of having reviews of the past achievements and rescheduling of previously undone work.}}
  
 
=== Feature Development ===
 
=== Feature Development ===

Revision as of 21:09, 8 May 2009

Iteration Planning

As part of our development process, we will be using iteration planning in order to divide the existing work load (aka IterationFeatures and subsequently also the work tasks generated from these) into smaller portions,

  • that can be tracked more easily
  • where overall time requirements for the achievement of a goal is reduced to a maximum limit, so that it becomes affordable by all of the participating individuals
  • where individual goals of one iteration are reduced so that they can be easily achieved by all of the participating individuals
  • TBD

Bases on these iteration plans, aka the iteration statement, we will be coordinating our work.

For that purpose, a template was defined which we will use for authoring of iteration plans, namely Template:OOPM:Templates:Documentation:Development:ReleaseIterationStatement:1.0.

For more information on the established process see the OOSE defined APM agile project management methology (http://www.oose.de/projektmanagement/detail/apm_-_agiles_projektmanagement.html).

The OOSE defined APM project management methodology defines the scheduling of each iteration *TIME BOXING*. This basically means that each iteration is fixed in both its begin and end datetime, and may not be prolonged once scheduled.


TBD In comes our agile movement of having reviews of the past achievements and rescheduling of previously undone work.


Feature Development

When doing feature development, for example in our case during the initial prototyping phase, we will split the lot of tasks into small sets of tasks that can easily be accomplished during one iteration. Whilst most feature development tasks may required just one single iteration, multiple iterations can be defined so that more complex features a/o a resulting larger number of actual work tasks will be split between multiple such iterations in order to keep overall work requirement low incl. also the impact that a single iteration has on the overall product.

Therefore, for feature development we will use the issue tracker to capture the features, which themselves are based on our requirements analysis, that we have scheduled for the given iteration. We will then develop against those issues. However, as individual features, the APM calls these IterationFeatures, can be rather complex, we will create multiple work tasks as issues for these features. In the iteration statement itself we will only refer to the top level iteration features addressed by the given iteration, basically the issues associated with each iteration feature to be successfully implemented, or failed to be implemented jit.

TBD


Software Feature Development

TBD


Documentation Feature Development

TBD

Maintenance Development

When doing maintenance development, e.g. fixing issues with the existing releases in continued support or simply fixing issues with the newly developed features in a previously executed feature development phase, we will use a maintenance iteration statement.

Whilst maintenance is often just one iteration, with all the issues' solutions being the produces of such an iteration, multiple such iterations may exist during a single maintenance development phase. See feature development above.

TBD


Software Maintenance Development

TBD


Documentation Maintenance

TBD