Difference between revisions of "Extensions/website/Minutes/2007-10"

From Apache OpenOffice Wiki
Jump to: navigation, search
m (updated list of minute taker)
(update on AIs)
Line 35: Line 35:
 
| 2_2007-8-23: solve open site layout issues according to todo list || TBO || in progress ||  
 
| 2_2007-8-23: solve open site layout issues according to todo list || TBO || in progress ||  
 
|-
 
|-
| 3_2007-8-23: provide Action plan for Localization Framework || tbd. (Simon Lopez) || stalled ||  
+
| 3_2007-8-23: provide Action plan for Localization Framework || tbd. (Simon Lopez) || closed||  
 
|-
 
|-
 
| 2_2007-8-30: Define Requirements for Tooltips in Extension Manager and Update Notification || BH (KSO) || in progress ||  
 
| 2_2007-8-30: Define Requirements for Tooltips in Extension Manager and Update Notification || BH (KSO) || in progress ||  
 
|-
 
|-
| 3_2007-8-30: Follow up on localization of extension site || JSC || in progress ||  
+
| 3_2007-8-30: Follow up on localization of extension site || JSC || closed ||  
 
|-
 
|-
 
| 2_2007-9-06: Talk to STS about the page which is displayed after downloading an extension. || MD || in progress ||
 
| 2_2007-9-06: Talk to STS about the page which is displayed after downloading an extension. || MD || in progress ||
Line 48: Line 48:
 
|-
 
|-
 
| 3_2007-9-20: Provide "get in contact" checkbox for extension submitter to receive feedback via webform from users. || TBO || in progress||
 
| 3_2007-9-20: Provide "get in contact" checkbox for extension submitter to receive feedback via webform from users. || TBO || in progress||
 +
|-
 +
| 1_2007-10-04: Review and update site todo list || TBO || new ||
 +
|-
 +
| 2_2007-10-04: Clarify infrastructure for localization of static content with Thorsten || JSC || new ||
 +
|-
 +
| 3_2007-10-04: Propose workflow for localization of static content || JSC || new ||
 
|}
 
|}
  
 
'''Comments on Action Items'''
 
'''Comments on Action Items'''
  
*1_2007-8-23:
+
*1_2007-8-23: no update
*2_2007-8-23:
+
*2_2007-8-23: the old list is at [[Extensions/website/Minutes/2007-08#Site_Design_Topics]]. This AI will be closed in favor of a new one 1_2007-10-04
*3_2007-8-23:
+
*3_2007-8-23: closed due to inactivity
*2_2007-8-30:
+
*2_2007-8-30: The online update extensions specification is to be extended for the general / English part first; with additional information about localization then.
*3_2007-8-30:
+
*3_2007-8-30: closed; discussion led to the AIs for JSC mentioned below.
*2_2007-9-06:
+
*2_2007-9-06: no update
*1_2007-9-13:
+
*1_2007-9-13: the removal of "By Tag" has been proposed
*3_2007-9-13:
+
*3_2007-9-13: stalled; no update
*3_2007-9-20:
+
*3_2007-9-20: no update
  
 
== IRC Details ==
 
== IRC Details ==
  
 
*[[Extensions/website/Minutes/2007-10/2007-10-04-IRCLogs|IRC Log]]
 
*[[Extensions/website/Minutes/2007-10/2007-10-04-IRCLogs|IRC Log]]

Revision as of 13:43, 10 October 2007

2007-10-04

10:00–11:00 CEST

Attendees

  • Bettina Haberer (IRC: bettina-h)
  • Joachim Lingner (IRC: jl)
  • Jürgen Schmidt (IRC: jsc)
  • Kai Sommerfeld (IRC: kso)
  • Martin Damboldt (IRC: mdamboldt)
  • Stefan Taxhet (IRC: stx12)
  • Thorsten Bosbach (IRC: b_osi)
  • Nils Fuhrmann (IRC: SunNF)
  • Stella Schulze (IRC: ?)
  • Olaf Felka (IRC: olaf-f)
  • Jörg Skottke (IRC: skotti)
  • Laurent Godard (IRC: lgodard)
  • Simon Lopez (IRC: slopez)
  • Mathias Michel (IRC: matm)

Minute Taker: ST (NF, TBO, KSO, STS, JL, JSC, MD, BH, ST)

Action Items

Action Items
Item Owner Status Due Date
1_2007-8-23: find out whether ClamAV is available for the platform our extension site server is running on MD in progress
2_2007-8-23: solve open site layout issues according to todo list TBO in progress
3_2007-8-23: provide Action plan for Localization Framework tbd. (Simon Lopez) closed
2_2007-8-30: Define Requirements for Tooltips in Extension Manager and Update Notification BH (KSO) in progress
3_2007-8-30: Follow up on localization of extension site JSC closed
2_2007-9-06: Talk to STS about the page which is displayed after downloading an extension. MD in progress
1_2007-9-13: provide some statistics about the usage of "By Tag" compared to the tag cloud ST open
3_2007-9-13: prepare a discussion proposal how we can collect feedback and how we can handle the feedback MATM open
3_2007-9-20: Provide "get in contact" checkbox for extension submitter to receive feedback via webform from users. TBO in progress
1_2007-10-04: Review and update site todo list TBO new
2_2007-10-04: Clarify infrastructure for localization of static content with Thorsten JSC new
3_2007-10-04: Propose workflow for localization of static content JSC new

Comments on Action Items

  • 1_2007-8-23: no update
  • 2_2007-8-23: the old list is at Extensions/website/Minutes/2007-08#Site_Design_Topics. This AI will be closed in favor of a new one 1_2007-10-04
  • 3_2007-8-23: closed due to inactivity
  • 2_2007-8-30: The online update extensions specification is to be extended for the general / English part first; with additional information about localization then.
  • 3_2007-8-30: closed; discussion led to the AIs for JSC mentioned below.
  • 2_2007-9-06: no update
  • 1_2007-9-13: the removal of "By Tag" has been proposed
  • 3_2007-9-13: stalled; no update
  • 3_2007-9-20: no update

IRC Details

Personal tools