Difference between revisions of "Agile Experiment PDF-Import 2007"

From Apache OpenOffice Wiki
Jump to: navigation, search
(Product Backlog)
m (Product Backlog)
Line 30: Line 30:
  
 
[http://www.mountaingoatsoftware.com/product_backlog Example and description of a Product Backlog]
 
[http://www.mountaingoatsoftware.com/product_backlog Example and description of a Product Backlog]
 +
 
[http://theagileblog.net/2006/01/a_product_owners_guide_to_prod.html Hints for the Product Backlog Maintainer]
 
[http://theagileblog.net/2006/01/a_product_owners_guide_to_prod.html Hints for the Product Backlog Maintainer]
  

Revision as of 13:00, 2 November 2007

A loose gathering of resources and ideas about the Agile Experiment in developing PDF-Import in 2007.

Organization

Time Frame

From 5.11.2007: 4-6 weeks

Possible Iterations:

  1. 8.11. - 21.11.
  2. 22.11. - 5.12.
  3. 6.12. - 19.12.


Practices to Adopt

Suggestions

  • Scrum roles (Product Owner, Team, Scrum master)
  • Colocation
  • Team that includes definition, code-writing and testing together
  • Time Boxing
  • Continuous testing
  • Short, fixed-time iterations
  • Daily (or more frequent) integration + builds
  • "Scope" is variable <=> "time", "cost" and "quality" are fix.
  • Regular reflection

Resources

Product Backlog

- (Link to the Product Backlog page for this project) -

Example and description of a Product Backlog

Hints for the Product Backlog Maintainer

Iteration Backlogs

(Link to the Iteration Backlog pages)

Agile Manifesto

Agile Methodology

English:

German:

Planning

Characteristics of User Stories

User stories shall be "INVESTed":

  • independent
  • negotiable
  • valuable
  • estimable
  • small
  • testable
Personal tools