Difference between revisions of "Agile Experiment PDF-Import 2007"

From Apache OpenOffice Wiki
Jump to: navigation, search
(link to Writer/ToDo/PDF Import)
(Time Frame)
Line 8: Line 8:
 
From 5.11.2007:  4-6 weeks
 
From 5.11.2007:  4-6 weeks
  
Possible Iterations:
+
==== Iterations ====
#  8.11. - 21.11.
+
#  8.11. - 19.11. (Thu.-Mon.)
# 22.11. -  5.12.
+
# 20.11. -  3.12. (Tue.-Mon.)
6.12. - 19.12.
+
4.12. - 17.12. (Tue.-Mon.)
 
+
  
 
=== Practices to Adopt ===
 
=== Practices to Adopt ===

Revision as of 17:44, 6 November 2007


A loose gathering of resources and ideas about the Agile Experiment in developing PDF-Import in 2007.

Organization

Time Frame

From 5.11.2007: 4-6 weeks

Iterations

  1. 8.11. - 19.11. (Thu.-Mon.)
  2. 20.11. - 3.12. (Tue.-Mon.)
  3. 4.12. - 17.12. (Tue.-Mon.)

Practices to Adopt

Suggestions

  • Scrum roles (Product Owner, Team, Scrum master)
  • Colocation
  • Team that includes definition, code-writing and testing together
  • Time Boxing
  • Continuous testing
  • Short, fixed-time iterations
  • Daily (or more frequent) integration + builds
  • "Scope" is variable <=> "time", "cost" and "quality" are fix.
  • Regular reflection

Agile Methodolgy in General

Agile Manifesto

English descriptions

German descriptions (as most team members are german, these may be useful)


Planning

Product Backlog

- (Link to the Product Backlog page for this project) -

Example and description of a Product Backlog

Hints for the Product Backlog Maintainer

Characteristics of User Stories

User stories shall be "INVESTed":

  • independent
  • negotiable
  • valuable
  • estimable
  • small
  • testable

Iteration Backlogs

(Link to the Iteration Backlog pages)

Other Pages

Writer/ToDo/PDF Import

Personal tools